Transformation of Boarding Gate at HKIA Terminal Buildings

Client :

Hong Kong Airport Authority

Contractor :

Union Construction (Group) Ltd.

Period

2019 to 2022

Building Scope:

The project will be based on a hypothetical scenario that the forty-night (49) Boarding Gates of Terminal 1 of Hong Kong International Airport would be closed for revamp with the shortest construction period. Due to the complexity of its works nature and to cater to ongoing works within the airport, the course of works for each phase, quality, health and safety, environmental protection, buildability, DfMA and maintenance will be discussed and analyzed through the BIM model. In the demolition and refurbishment of each phase, the team concentrates on the following key issues during the construction stage.

BIM Scope of Works: