Relocation Works of Gate 4 – HKIA

Owner :
Hong Kong Airport Authority

Contractor :
Union Construction (Group) Ltd.

Period
2023 – 2025
Project Scope:
The Contractor shall be responsible for carrying out the Builder’s Works including, but are not limited to the following:
- New Building of Gate S4
- Existing Fixed-link Bridge No.4
- Existing Metal Shelter at Apron
- Civil & Structural Works
- Electrical Works
- Mechanical Works
- Fire Services Works
- Lift and Escalator Works
- Airport Systems
BIM Scope of Works
- Project Management
- As-Construction BIM Modelling for Arch / Structure / Façade / MEP
- Coordination meeting Client, Consultant and Contractors
- Drawing generation from the BIM models for construction
- Clash / RFI Reporting
- 3D Rendering for design verification
- As-Built BIM Model
- 5D BIM for procurement
- 4D BIM Simulation for phase planning and construction sequency