Enhancement Works of Remote Transfer Baggage Handling Facility at Midfield Concourse - HKIA

Owner :
Hong Kong Airport Authority

Contractor :
CLPe Solutions Limited Project

Period
2022 – 2024
The Baggage Handling System work of this contract
comprises two principal areas as outlined below:
Expansion and modification of the existing baggage facility for transfer bag screening and handling at the MFC
Modifications to existing control systems associated with the BHS to support the conveyor system in the MFC and to integrate the modified baggage facility at the MFC into the relevant existing airport systems.
BIM Scope of Works
- Project Management
- As-Construction BIM Modelling
- Coordination meeting Client, Consultant and Contractor
- Clash / RFI Reporting
- BIM Submission
- As-Built BIM Model
- BIM training in project management and construction teams