Extension of Government VIP Lounge & HKIA Lounge

Client :
Hong Kong Airport Authority

Contractor :
Yearfull Contracting Ltd. Building

Period
Aug. 2020 to End of 2022
Building Scope:
The Works comprise modifications to the existing tenant office lobby at level 3 and the existing ramp office (where the new VIP Lounge will be located) at level 4 at the northern end of the Terminal 1 (T1) North Concourse to create an additional space for the expansion of existing Government VIP Lounge and construction of a single storey extension to T1 North Concourse at level 4 with landside access to create an entrance for the new
HKIA Lounge.
Due to the complexity of its works nature and to cater to ongoing works within the airport, the course of works for each phase, quality, health and safety, environmental protection, buildability, DfMA and maintenance will be discussed and analyzed through the BIM model. In the demolition and refurbishment of each phase, the team concentrates on the following key issues during the construction stage.
BIM Scope of Works
- As-Construction BIM Modeling including Landscape, Arch, Structure & MEP
- The BIM model shall constantly be kept up to date to facilitate the coordination between various disciplines and resolving conflicts for DFMA.
- BIM Consultant shall continuously update and submit the works in the 3D BIM format.
- To support the constructability, operability, accessibility, maintainability and building quality by 4D-BIM simulation and propose visual means such as interactive 3D model which can walk through / fly through inside the model.
- To perform clash detection between components of the BIM models, e.g. clashes among architectural, structural and building services elements, etc.
- Delivery of the LOD500 BIM model for asset management and operation.