Relocation of Sha Tin Sewage Treatment Works to Caverns

Client :

Drainage Services Department of HKSAR

Contractor :

China State – Alchmex Joint Venture

Period :

Feb. 2020 – Jul.2022

Building Scope:

The relocation of the Sha Tin Sewage Treatment Works (STSTW) to caverns, with a view to releasing the existing site (about 28 hectares) for other beneficial uses.

BIM Scope of Works:

Liaison and co-ordination with all concerned parties as required for the preparation, updating and submission of information using the BIM models
Submission of the draft as-built BIM Model prior to the issue of the Practical Completion Certificate of the Works;

Handing over the final, approved as-built 3D BIM Model prior to the issue of the Defects Liability Certificate complying with the requirements of the Specification, BIM Standard Manual and Computer Aided Design (CAD) Standard Manual as given in the Specification – Technical, Appendix SP.N and Appendix SP.O to the Specification – Preliminaries