The Electrical and Mechanical (E&M) works scope for the Kwu Tung MTR…
The site is located at Nos. 1-27 Shan Tung Street and Nos. 1-23 Thistle…
The Contractor shall be responsible for carrying out the Builder’s…
The Contractor shall be responsible for the design of all cabling works…
The Consultant shall provide consultancy services, covering…
Contractor shall be responsible for carrying out the Builder’s Works…
With Island South transforming into an energetic community…
The works to be carried out under this Contract comprise…
Expansion and modification of the existing baggage facility…
The objectives of this assignment are to provide a detailed recording…
The works to be carried out under this Contract comprise…
Coordination Meeting Client, Consultant And Contractor
As-Construction BIM Modelling for arch / structure / MEP
As-Construction BIM Modelling for glass balustrade and guarding…
A primary school with 5 floors and an outdoor playground.
The Works comprise modifications to the existing tenant office…
The relocation of the Sha Tin Sewage Treatment Works (STSTW)…
The project will be based on a hypothetical scenario…
A commercial complex with 5 towers of offices and apartment plus…
BIM Modelling for Asset Information Model.
The scope of works shall include the production of 3D BIM model(s)…
Residential Complex – shopping mall, car Park + 7 high rise towers & 7 low rise towers.
Recreation of Electrical & Mechanical Services Dept of HKSAR
The company is a consultant specializing in Building Information Modelling, Laser Scanning, 3D printing, Structural Engineering and MEP/MiMEP Coordination.